NEW CHITOSE AIRPORT PORTOM HALL will open in the International Passenger Terminal in November 2019 NEW CHITOSE AIRPORT PORTOM HALL will open in the International Passenger Terminal in November 2019

scroll

The new multi-purpose hall directly connected to the airport will launch The new multi-purpose hall directly connected to the airport will launch

MAP MAP

Supporting a wide variety of use scenarios from lectures to parties Supporting a wide variety of use scenarios from lectures to parties

FoyerFoyer
Foyer
The foyer can be used as an open space for exhibitions, buffets and other exchanges.
Main HallMain Hall
Main Hall
What features the Portom Hall? It gorgeously produces events for 300 to 400 participants.
Seminar RoomSeminar Room
Seminar Room
Not only for seminars but also for exhibitions. It can be used with the foyer.
Meeting RoomMeeting Room
Meeting Room
This space will be available for small meetings or as an event office.
VIP roomVIP room
VIP room
An anteroom available for VIPs. The extensive space and sophisticated furniture will welcome and entertain you.
AnterooAnteroo
Anteroom
A functional anteroom can be used as a backstage.
The foyer can be used as an open space for exhibitions, buffets and other exchanges.

How an event held in the Porto Hall appears? How an event held in the Porto Hall appears?

2019.11.1-11.4 The 6th New Chitose Airport International Animation Festival 2019
2019.11.1-11.4 The 6th New Chitose Airport International Animation Festival 2019
2019.11.1-11.4 The 6th New Chitose Airport International Animation Festival 2019
2019.11.1-11.4 The 6th New Chitose Airport International Animation Festival 2019

Access

The Hall will be directly connected to the International Arrival Lobby (2F).
Will be located around 10 minutes on foot from the Domestic Terminal via the Connecting Path.

For more information, see the official website, "NEW CHITOSE AIRPORT PORM HALL".

CLICK here
ページトップへ